LINK LOGISTICS
MONTEBELLO
This project involved the repositioning of three warehouses and offices within an existing building located at 1719 Chapin Ave. in Montebello, CA.
Warehouse/office improvements included new office configuration in all three warehouses, structural upgrades for existing interior roll-up doors, scrub and seal warehouse floor, restroom refresh, electrical upgrades, fire suppression system upgrades, new scrim throughout, install of new overhead doors and dock equipment as well as new wrought iron trash gate.
Building exterior work involved complete exterior paint including all dock equipment, removal of all existing landscape and replace with zero scape drought tolerant landscaping, removal and replacement of all existing asphalt pavement with 6” section of new asphalt pavement, pavement restriping, removed the existing chain-link fence and replaced with wrought iron.
PROJECT TYPE
Repositioning Industrial Warehouse and Spec TI
SIZE
84,026 SF
CLIENT
Link Logistics
SPECIALTIES
Industrial Warehouse
LOCATION
Montebello CA