KECK HOSPITAL OF USC, HSC
CAMPUS NURSE CALL REPLACEMENT
The project calls for the replacement of the existing Zettler nurse call system within USC Keck’s Main Hospital.
In total, ConAm/Hill Rom installed 375 +/- devices in the Gold Tower floors 1 (ETC), 2-9 and Cardinal Tower 2, 3 and 4. The project was constructed under OSHPD-1 guidelines.
The project presented various challenges including working within a fully-operational hospital environment. ConAm worked with USC’s vendors and contractors
(medical equipment, tele-data cabling, AV, etc.) to ensure streamlined communications and timely delivery. We implemented our Disruption Avoidance Program (DAP) and presented USC with a multi-phased schedule, ICRA plan, and logistics plan. The schedule was broken out into 9 phases with 3-4 room conversions at a time. Our team worked night-shifts to minimize noise, vibration and/or odor that would affect ongoing operations of the facility.
PROJECT TYPE
Design-Bid-Build
SIZE
10,800 SF
CLIENT
City of Hope Medical Foundation
SPECIALTIES
Healthcare - OSHPD 1
ARCHITECT/S
c|a Architects
LOCATION
Los Angeles, CA