CITY OF HOPE SHARPIRO
TISSUE QUALIFICATIONS
Interior demolition and renovation of an existing, 1-story, cancer research lab that was built in 1982. Structural upgrades to the existing building, including steel column strengthening and footing upsizing.
Support and seismic restraints were installed including sway bracing for all hangers for suspended equipment piping as well as all necessary anchorage for equipment and casework. All new finishes, including flooring, tile, acoustical ceilings, and paint. All new lab casework with Corian sinks and a new deionized water treatment system for all lab sinks. All new HVAC systems, including new AHU, hydronic heaters, pumps, VFD, and CEV/CAV’s. All new electrical switchgear, panels, and distribution boards. A new acid waste system, new restrooms, new water service to the building, including new backflow and PRV. All new fire sprinkler systems to the building with backflow and riser. All new fire alarm systems to the building and tied into the campus master loop.
PROJECT TYPE
Design-Bid- Build
SIZE
14,408 SF
CLIENT
Beckman Research Institute of the City of Hope
SPECIALTIES
Lab Research
ARCHITECT/S
Farnsworth Group
LOCATION
Duarte, CA